July 4th Aerial View

July 4th Road Closures

Find out more about the proposed road closures, lane closures, parking permits, and meter bagging in order to plan ahead for your experience downtown at Let Freedom Sing! Music City July 4th.

Monday | June 16, 2025

6am
Close Sidewalks on east side of 1st Avenue (Korean Veterans Boulevard to Church Street) --- closed for set-up as needed; otherwise to remain open for pedestrian access (REOPEN Wednesday, July 9, 2025, by 6PM)

Wednesday | June 25, 2025

12am
NO PARKING on Titans Way from Russell Street to Victory Lane (REOPEN on Sunday, July 6, 2025, by 6PM)

Close Victory Lane cut-out area (North side of street) just south of the Nissan Stadium south-endzone area (REOPEN Monday, July 7, 2025, by 12pm)

Thursday | June 26, 2025

5am
Close Victory Lane from Titans Way to South 1st Street (REOPEN on Sunday, July 6, 2025, by 6PM)

Close Titans Way from Russell Street to Victory Lane (REOPEN on Sunday, July 6, 2025, by 6PM)

Close Russell Street from North 1st Street to Titans Way (REOPEN on Sunday, July 6, 2025, by 6PM)

Close North 1st Street from Woodland Street to Russell Street (LOCAL TRAFFIC ONLY- NO THRU TRAFFIC) (REOPEN on Sunday, July 6, 2025, by 6PM)

Close Sidewalks on Victory Lane (Titans Way to South 1st Street) --- closed for set-up as needed (REOPEN Sunday, July 6, 2025, by 6pm)

Close Sidewalks on Titans Way (Russell Street to Victory Lane) --- closed for set-up as needed (REOPEN Sunday, July 6, 2025, by 6PM)

Close Sidewalks on Russell Street (North 1st Street to Titans Way) --- closed for set-up as needed (REOPEN Sunday, July 6, 2025, by 6PM)

Close Sidewalks on North 1st Street (Woodland Street to Russell Street) --- closed for set-up as needed (REOPEN Sunday, July 6, 2025, by 6PM)

6am
Close Sidewalks underside of John Seigenthaler Pedestrian Bridge from 1st Avenue to 2nd Avenue --- closed for set-up as needed; otherwise to remain open for Pedestrian access (REOPEN Sunday, July 6, 2025, by 6PM)

Close Sidewalks underside of John Seigenthaler Pedestrian Bridge from 2nd Avenue to 3rd Avenue --- closed for set-up as needed; otherwise to remain open for pedestrian access (REOPEN Sunday, July 6, 2025, by 6PM)

Friday | June 27, 2025

6am
Close 1st Avenue cut-out area (East side of street) just north of Molloy Street near Ascend (REOPEN Sunday, July 6, 2025, by 6PM)

Close 1st Avenue cut-out area (East side of street) just south of Broadway (REOPEN Tuesday, July 8, 2025, by 6PM)

Road Closure 1 - July 4, 2025
Thursday, June 26, 2025 at 5am - Friday, June 27, 2025 at 5am

Saturday | June 28, 2025

12am
Bag all meters on 1st Avenue (Demonbreun to Church Street) – NO PARKING (REMOVE BAGS Monday, July 7, 2025)

Bag all meters on 2nd Avenue (Demonbreun to Broadway) – NO PARKING (REMOVE BAGS on Monday, July 7, 2025

4am
Close Arrival Court (REOPEN on Monday, July 7, 2025, by 6PM)

6am
Close Sidewalks on west side of 1st Avenue (Demonbreun to Church Street) --- closed for set-up as needed; otherwise to remain open for pedestrian access (REOPEN Monday, July 7, 2025, by 6PM)

Sunday | June 29, 2025

4am
Close 1st Avenue from Demonbreun to Church Street (REOPEN on Monday, July 7, 2025, by 6PM)

Close Broadway from 1st Avenue to 2nd Avenue (REOPEN on Monday, July 7, 2025, by 6PM)

Close ACME Alley (REOPEN Monday, July 7, 2025, by 6PM)

Close Sidewalks on Broadway (1st Avenue to 2nd Avenue) --- closed for set-up as needed; otherwise to remain open for pedestrian access (REOPEN Monday, July 7, 2025, by 6PM)

Close Sidewalks on west side of 1st Avenue (Demonbreun to Korean Veterans Boulevard) --- closed for set-up as needed; otherwise to remain open for pedestrian access (REOPEN Sunday, July 6, 2025, by 12PM)

Close Sidewalks on east side of Rep. John Lewis Way (Demonbreun to Broadway) --- closed for set-up as needed; otherwise to remain open for pedestrian access (REOPEN Sunday, July 6, 2025, by 6PM)

Close Sidewalks on 2nd Avenue (Demonbreun to Broadway) --- closed for set-up as needed; otherwise to remain open for pedestrian access (REOPEN Saturday, July 5, 2025, by 6AM)

Saturday, June 28, 025 at 4am - Sunday, June 29, 2025 at 4am

Monday | June 30, 2025

12am
Bag all meters on 4th Avenue (Demonbreun to Broadway) – NO PARKING (REMOVE BAGS on Saturday, July 5, 2025)

Parking Permits for the 6 meters along 4th Avenue from Hilton Valet to Demonbreun (through Saturday, July 5, 2025)

6am
Close Sidewalks on Gay Street Connector (1st Avenue to 1st Avenue) --- closed for Set-up as needed; otherwise to remain open for pedestrian access (REOPEN Saturday, July 5, 2025, by 6PM)

Tuesday | July 1, 2025

6am
Close northernmost Delivery Lane on Broadway from 2nd Avenue to 6th Avenue --- closed for set-up as needed; otherwise to remain open for vehicle delivery access (REOPEN Saturday, July 5, 2025, by 8AM)

Close southernmost Delivery Lane on Broadway from 2nd Avenue to Rep. John Lewis Way --- closed for set-up as needed; otherwise to remain open for vehicle delivery access (REOPEN Saturday, July 5, 2025, by 8AM)

Close Sidewalks on Broadway (2nd Avenue to 6th Avenue) --- closed for set-up as needed; otherwise to remain open for pedestrian access (REOPEN Saturday, July 5, 2025, by 6PM)

Close Sidewalks on Korean Veterans Boulevard from South 2nd Street to 2nd Avenue --- closed for set-up as needed; otherwise to remain open for pedestrian access (REOPEN Saturday, July 5, 2025, by 6PM)

Close Sidewalks on 2nd Avenue (Broadway to Commerce Street) --- closed for set-up as needed; otherwise to remain open for pedestrian access (REOPEN Saturday, July 5, 2025, by 6AM)

Close Sidewalks on Commerce Street (2nd Avenue to 3rd Avenue) --- closed for set-up as needed; otherwise to remain open for pedestrian access (REOPEN Saturday, July 5, 2025, by 10AM)

Close Sidewalks on 3rd Avenue (Union to James Robertson Parkway) --- closed for set-up as needed; otherwise to remain open for pedestrian access (REOPEN Saturday, July 5, 2025, by 6PM)

Close south side sidewalk John Seigenthaler Pedestrian Bridge from South 1st Street to 3rd Avenue --- closed for set-up as needed; otherwise to remain open for pedestrian access (REOPEN Saturday, July 5, 2025, by 5PM)

Close Sidewalks on 1st Avenue (Church Street to Union) --- closed for set-up as needed; otherwise to remain open for pedestrian access (REOPEN Saturday, July 5, 2025, by 6AM)

Sunday, June 29, 2025 at 4am - Tuesday, July 1, 2025 at 6am

Wednesday | July 2, 2025

12am
Bag all meters on Commerce Street (2nd Avenue to 3rd Avenue) – NO PARKING (REMOVE BAGS on Saturday, July 5, 2025)

Bag all meters on the Gay Street Connector (1st Avenue to 1st Avenue) – NO PARKING (REMOVE BAGS on Saturday, July 5, 2025)

Bag all meters on Molloy Street (1st Avenue to 2nd Avenue) – NO PARKING (REMOVE BAGS Saturday, July 5, 2025)

Bag all meters on Demonbreun (1st Avenue to 2nd Avenue) – NO PARKING (REMOVE BAGS Saturday, July 5, 2025)

Bag all meters on 2nd Avenue (Broadway to Commerce Street) – NO PARKING (REMOVE BAGS on Monday, July 7, 2025

Thursday | July 3, 2025

12am
Bag all meters on Korean Veterans Boulevard (1st Avenue to 2nd Avenue) – NO PARKING (REMOVE BAGS Sunday, July 6, 2025)

Bag all meters on 3rd Avenue (Demonbreun to Commerce Street) – NO PARKING (REMOVE BAGS on Saturday, July 5, 2025)

Bag all meters on 4th Avenue (Broadway to Commerce Street) – NO PARKING (REMOVE BAGS on Saturday, July 5, 2025)

Bag all meters on 6th Avenue (Demonbreun to Broadway) – NO PARKING (REMOVE BAGS on Saturday, July 5, 2025)

Bag all meters on 7th Avenue (Demonbreun to Commerce Street) – NO PARKING (REMOVE BAGS on Saturday, July 5, 2025)

Bag all meters on 8th Avenue (Demonbreun to Commerce Street) – NO PARKING (REMOVE BAGS on Saturday, July 5, 2025)

Bag all meters on 9th Avenue (Demonbreun to Commerce Street) – NO PARKING (REMOVE BAGS on Saturday, July 5, 2025)

Bag all meters on Broadway (Rep. John Lewis Way to 10th Avenue) – NO PARKING (REMOVE BAGS on Saturday, July 5, 2025)

Bag all meters on Commerce Street (3rd Avenue to 10th Avenue) – NO PARKING (REMOVE BAGS on Saturday, July 5, 2025)

Bag all meters on Church Street (1st Avenue to 3rd Avenue) – NO PARKING (REMOVE BAGS on Saturday, July 5, 2025)

Bag all meters on Bank Street (1st Avenue to 2nd Avenue) – NO PARKING (REMOVE BAGS Saturday, July 5, 2025)

Bag all meters on 1st Avenue (Church Street to Union) – NO PARKING (REMOVE BAGS Saturday, July 5, 2025)

Bag all meters on Korean Veterans Boulevard from 2nd Avenue to 8th Avenue – NO PARKING (REMOVE BAGS on Saturday, July 5, 2025)

Bag all meters on Deaderick Street (3rd Avenue to 6th Avenue) ---NO PARKING (REMOVE BAGS Saturday, July 5, 2025)

Cover all “NO PARKING 6AM to 6PM” / “Loading Zone” signs on Commerce Street (2nd Avenue to 10th Avenue) --- NO PARKING (REMOVE COVERS Saturday, July 5, 2025)

Cover all “NO PARKING 6AM TO 6PM” and ALL OTHER “NO PARKING” signs on Broadway (Rep. John Lewis Way to 12th Avenue) --- NO PARKING (REMOVE COVERS Saturday, July 5, 2025)

Cover all “Loading Zone” signs on east side of 3rd Avenue (Broadway to Demonbreun) --- NO PARKING (REMOVE COVERS Saturday, July 5, 2025)

6am
Close Korean Veterans Boulevard west-bound lane between Gateway Bridge and 1st Avenue, south turn lane at 1st Avenue (REOPEN on Saturday, July 5, 2025, by 6AM)

Close Chiefs Alley (REOPEN Saturday, July 5, 2025, by 6AM)

Close Broadway from 2nd Avenue to Rep. John Lewis Way (REOPEN on Saturday, July 5, 2025, by 6AM)

Close AT&T Alley (REOPEN Saturday, July 5, 2025, by 6AM)

Close 2nd Avenue from Demonbreun to Church Street (REOPEN on Saturday, July 5, 2025, by 6AM)

Close 2nd Avenue from Demonbreun to Church Street (REOPEN on Saturday, July 5, 2025, by 6AM)

Reroute south-bound lanes of 4th Avenue North from Commerce Street to Broadway to two-way traffic (REOPEN by Saturday, July 5, 2025, by 6AM)

Close Rep. John Lewis Way from Demonbreun to Hilton Valet (REOPEN on Saturday, July 5, 2025, by 6PM)

Close Rep. John Lewis Way southbound from Broadway to Hilton Valet (REOPEN on Saturday, July 5, 2025, by 6PM)

Close Gay Street Connector from 1st Avenue to 1st Avenue (LOCAL TRAFFIC ONLY – NO THRU TRAFFIC) (REOPEN on Saturday, July 5, 2025, by 6AM)

Close Sidewalks on 2nd Avenue (Commerce to Church Street) --- closed for set-up as needed; otherwise to remain open for pedestrian access (REOPEN Saturday, July 5, 2025, by 12PM)

Close Sidewalks on 3rd Avenue (Demonbreun to Commerce Street) --- closed for set-up as needed; otherwise to remain open for pedestrian access (REOPEN Saturday, July 5, 2025, by 6AM)

Close Sidewalks on 4th Avenue (Demonbreun to Commerce Street) --- closed for set-up as needed; otherwise to remain open for pedestrian access (REOPEN Saturday, July 5, 2025, by 6AM)

Close Sidewalks on west side of Rep. John Lewis Way (Demonbreun to Broadway) --- closed for set-up as needed; otherwise to remain open for pedestrian access (REOPEN Saturday, July 5, 2025, by 10AM)

Close Sidewalks on 6th Avenue (Demonbreun to Broadway) --- closed for set-up as needed; otherwise to remain open for pedestrian access (REOPEN Saturday, July 5, 2025, by 10AM)

Close Sidewalks on Union (3rd Avenue to Woodland Street Bridge) --- closed for set-up as needed; otherwise to remain open for pedestrian access (REOPEN Saturday, July 5, 2025, by 10AM)

Close Sidewalks on Bank Street (1st Avenue to 2nd Avenue) --- closed for set-up as needed; otherwise to remain open for pedestrian access (REOPEN Saturday, July 5, 2025, by 6AM)

Close Sidewalks on Church Street (1st Avenue to 2nd Avenue) --- closed for set-up as needed; otherwise to remain open for pedestrian access (REOPEN Saturday, July 5, 2025, by 6AM)

Close Sidewalks on Molloy Street (1st Avenue to 2nd Avenue) --- closed for set-up as needed; otherwise to remain open for pedestrian access (REOPEN Saturday, July 5, 2025, by 6AM)

Close Sidewalks on Demonbreun (1st Avenue to 2nd Avenue) --- closed for set-up as needed; otherwise to remain open for pedestrian access (REOPEN Saturday, July 5, 2025, by 6AM)

11pm
Close Victory Lane from South 1st Street to South 2nd Street (REOPEN on Saturday, July 5, 2025, by 2PM)

Close South 1st Street from Victory Lane to South 2nd Street (1st becomes Davidson) (REOPEN on Saturday, July 5, 2025, by 2PM)

Close South 2nd Street from Shelby Avenue to Victory Lane (REOPEN on Saturday, July 5, 2025, by 2PM)

Close Sidewalks on Victory Lane (South 1st Street to South 2nd Street) --- closed for set-up as needed (REOPEN Saturday, July 5, 2025, by 2PM)

Close Sidewalks on South 1st Street (Victory Lane to South 2nd Street – 1st becomes Davidson) --- closed for set-up as needed (REOPEN Saturday, July 5, 2025, by 2PM)

Close Sidewalks on South 2nd Street (Shelby Avenue to Victory Lane) --- closed for set-up as needed (REOPEN Saturday, July 5, 2025, by 2PM)

Thursday, July 3, 2025 at 6am - Thursday, July 3, 2025 at 11pm

Friday | July 4, 2025

4am
Close Broadway from Rep. John Lewis Way to 6th Avenue (REOPEN on Saturday, July 5, 2025, by 6AM)

Close Rep. John Lewis Way from Broadway to Commerce Street (LOCAL TRAFFIC ONLY – NO THRU TRAFFIC) (REOPEN on Saturday, July 5, 2025, by 6AM)

Close Rep. John Lewis Way northbound from Hilton Valet to Broadway (REOPEN on Saturday, July 5, 2025, by 6AM)

Close 6th Avenue Northbound Lanes Only from Demonbreun to Broadway (LOCAL TRAFFIC ONLY- NO THRU TRAFFIC) (REOPEN on Saturday, July 5, 2025 by 6AM)

Close 1st Avenue from Church Street to Union Street (REOPEN on Saturday, July 5, 2025, by 6AM)

Close Church Street from 1st Avenue to 2nd Avenue (REOPEN on Saturday, July 5, 2025, by 6AM)

Close Grumpy’s Bail Bonds Alley (REOPEN on Saturday, July 5, 2025, by 6AM)

Close Bank Street from 1st Avenue to 2nd Avenue (REOPEN on Saturday, July 5, 2025, by 6AM)

Reroute northbound lanes of 2nd Avenue North from Church Street to Union Street to two-way traffic (REOPEN by Saturday, July 5, 2025, by 6AM)

Close 1st Avenue from Korean Veterans Boulevard to Demonbreun (REOPEN on Saturday, July 5, 2025, by 6AM)

Close Asurion Alley (REOPEN Saturday, July 5, 2025, by 6AM)

Close Molloy Street from 1st Avenue to 2nd Avenue (REOPEN on Saturday, July 5, 2025, by 6AM)

Close Demonbreun from 1st Avenue to 2nd Avenue (LOCAL TRAFFIC ONLY – NO THRU TRAFFIC) (REOPEN on Saturday, July 5, 2025, by 6AM)

Close Demonbreun eastbound lane from 3rd Avenue to 2nd Avenue (LOCAL TRAFFIC ONLY – NO THRU TRAFFIC) (REOPEN on Saturday, July 5, 2025, by 6AM)

Close Demonbreun westbound lane from 4th Avenue to Rep. John Lewis Way – Reroute center turn lane to westbound traffic lane (REOPEN on Friday, July 4, 2025, by 9PM)

6am
Close Symphony Place (REOPEN Saturday, July 5, 2025, by 6AM)

Close inbound lanes of Korean Veterans Boulevard/Gateway Bridge from South 2nd Street to 2nd Avenue (REOPEN by Saturday, July 5, 2025, by 12AM)

Reroute out-bound lanes of Korean Veterans Boulevard/Gateway Bridge to two-way traffic from 2nd Avenue to South 2nd Street

Close 4th Avenue cut-out area (East side of street) near Schermerhorn just north of Demonbreun (REOPEN Saturday, July 5, 2025, by 6AM)

Close Sidewalks on 2nd Avenue (Church Street to Union) --- closed for set-up as needed; otherwise to remain open for pedestrian access (REOPEN Saturday, July 5, 2025, by 6AM)

Close Sidewalks on 3rd Avenue (Commerce Street to Union) --- closed for set-up as needed; otherwise to remain open for pedestrian access (REOPEN Saturday, July 5, 2025, by 6AM)

Close Sidewalks on Rep. John Lewis Way (Broadway to Commerce Street) --- closed for set-up as needed; otherwise to remain open for pedestrian access (REOPEN Saturday, July 5, 2025, by 6AM)

Close Sidewalks on 7th Avenue (Demonbreun to Commerce Street) --- closed for set-up as needed; otherwise to remain open for pedestrian access (REOPEN Saturday, July 5, 2025, by 6AM)

Close Sidewalks on 8th Avenue (Demonbreun to Commerce Street) --- closed for set-up as needed; otherwise to remain open for pedestrian access (REOPEN Saturday, July 5, 2025, by 6AM)

Close Sidewalks on Broadway (6th Avenue to 8th Avenue) --- closed for set-up as needed; otherwise to remain open for pedestrian access (REOPEN Saturday, July 5, 2025, by 6AM)

Close Sidewalks on James Robertson Parkway (3rd Avenue to James Robertson Parkway Bridge) --- closed for set-up as needed; otherwise to remain open for pedestrian access (REOPEN Saturday, July 5, 2025, by 6AM)

Close Sidewalks on Commerce Street (3rd Avenue to 8th Avenue) --- closed for set-up as needed; otherwise to remain open for pedestrian access (REOPEN Saturday, July 5, 2025, by 6AM)

Close Sidewalks on Demonbreun (2nd Avenue to 8th Avenue) --- closed for set-up as needed; otherwise to remain open for pedestrian access (REOPEN Saturday, July 5, 2025, by 6AM)

7am
Close 3rd Avenue from Demonbreun to Commerce Street (LOCAL TRAFFIC ONLY – NO THRU TRAFFIC) (REOPEN on Saturday, July 5, 2025, by 6AM)

Close 4th Avenue from Demonbreun to Commerce Street (LOCAL TRAFFIC ONLY- NO THRU TRAFFIC) (REOPEN on Saturday, July 5, 2025, by 6AM)

Close Opry Place (Ryman Alley) (REOPEN Saturday, July 5, 2025, by 6AM)

3pm
Close Broadway from 6th Avenue to 8th Avenue (REOPEN on Saturday, July 5, 2025, by 6AM)

Close 7th Avenue from Demonbreun to Commerce Street (REOPEN on Saturday, July 5, 2025, by 6AM)

Close 6th Avenue from Demonbreun to Broadway (LOCAL TRAFFIC ONLY – NO THRU TRAFFIC) (REOPEN on Saturday, July 5, 2025, by 6AM)

8pm (AT MNPD Discretion)
Close Woodland Street Bridge (REOPEN immediately following conclusion of fireworks show)

Close Church Street from 2nd Avenue to 3rd Avenue (REOPEN immediately following conclusion of fireworks show)

Close Union Street from 3rd Avenue to Woodland Street Bridge (REOPEN immediately following conclusion of fireworks show)

Close the John Seigenthaler Pedestrian Bridge (REOPEN immediately following conclusion of fireworks show) (time closed at discretion of MNPD and Fire Marshal Office)

The Woodland Street Bridge and John Seigenthaler Pedestrian Bridge will reopen immediately upon the conclusion of the Friday, July 4th fireworks show.

All roads to re-open no later than 6PM on Monday July 7, 2025

Friday, July 5, 2025 at 8pm - Friday, July 4, 2025 at 9pm